Project Scope
Commissioning of seven pump stations
Total installed power: 2.7 MW
27 pump units integrated into the system
Automation & Control
SCADA system setup and configuration
ABB frequency converters setup and parameterization
Performance Optimization
Optimization of P–Q curves for hydraulic efficiency and operational stability
Functional validation of pumping sequences and load distribution prior to handover



