Project Scope
Complete electrical layout and equipment selection
Electrical schematics developed in EPLAN P8 Electric
Switchgear cabinet assembly and delivery
System implementation
Programme implementation and commissioning
Engineering & Control Integration
Electrical architecture designed for high-load industrial operation
Control system implementation aligned with operational safety requirements
Structured commissioning process ensuring system stability prior to handover
Project Outcome
Operational crane system integrated into existing mining infrastructure
Verified electrical and control system functionality prior to deployment